Free heat pump for a flat: what warranty and servicing come with it, if your flat is eligible?

The Boiler Upgrade Scheme rules we found do not set a warranty length for a heat pump. What you are given after installation comes from MCS standards and from your installer’s paperwork, so ask for it in writing. MCS’s heat pump design standard says a handover pack must include the maintenance requirements and the manufacturer’s warranty details.

12 min read • Last reviewed • England & Wales

Free heat pump for 1 and 2 bedroom flats.*
Own a 1 or 2 bedroom flat heated by gas, oil, LPG or electricity? The heat pump we fit in flats — a compact indoor air-to-water unit, installed entirely inside your flat — is 100% covered by the Boiler Upgrade Scheme grant, so you pay nothing. Every one of the 192 flats we’ve had installed so far paid nothing. Book your free, no-obligation assessment.

*Terms and conditions apply. You must own the flat (landlords included); social housing and shared ownership aren’t eligible. It must replace gas, oil, LPG or electric heating, and the flat must not have had government heat pump funding before. Ofgem must approve the Boiler Upgrade Scheme grant, and our assessment and the installer’s heat loss survey must confirm the unit suits your flat. Any lease or freeholder consent must be in place. Installation is by our partner MCS certified installer, and the offer is subject to grant funding being available.

The short version

  • We found no paragraph in Ofgem’s installer guidance or the Boiler Upgrade Scheme regulations that sets a warranty or guarantee length for a heat pump. What you are given is set out in MCS standards and in your contract and handover pack.
  • MCS’s design standard says the handover pack must include the maintenance requirements and maintenance services available, and the manufacturer’s user manuals and warranty details.
  • MCS’s Installer Operating Requirements say the installer shall provide a written guarantee for the system’s design and the workmanship of the installation, and its Customer Commitment says the installer will tell you what to do to keep guarantees and warranties valid. Both are headed MCS:2025, the redeveloped scheme.
  • ByEco’s brochure says that at handover it shows you how to use the controls and explains the servicing needed to keep the manufacturer’s warranty valid. We do not state any warranty length or service price here: ask for them in writing.
  • A heat pump may be free of charge for an eligible flat, subject to survey and eligibility. Your free survey is the first step, and the written quote is where you can ask what comes after installation.

If you are weighing up a heat pump for your flat, it is fair to ask what happens once it is on the wall: who looks after it, what is guaranteed, and what you will be given on the day. This article sets out what the sources say, and where they say nothing. We state no warranty length, service interval or service price. For the general picture, see our guides to heat pump warranties, heat pump maintenance and how long heat pumps last.

What is guaranteed after a heat pump goes into a flat?

It depends on three separate things, and the grant is not one of them. First, the Boiler Upgrade Scheme sets rules about who may install and what counts as commissioned, and Ofgem may ask for the handover pack in an audit, but we found no warranty length in them. Second, MCS standards set out what the installer must give you at handover, and, for installers on MCS’s redeveloped scheme, a written guarantee. Third, your contract and the manufacturer’s terms say what is actually covered and for how long.

A heat pump may be free of charge for an eligible flat, subject to survey and eligibility, but you will still want the paperwork. Whether anything is left to pay is confirmed in the written quote after the survey.

What the Boiler Upgrade Scheme asks of the installer

The scheme’s rules are Ofgem’s and are written mainly for installers. Ofgem’s guidance for installers (version 5.2) says installers must be MCS certified to install the heating system they are applying for, and must also be members of an approved code of practice for consumer protection. It says consumer codes aim to ensure a high standard of consumer protection throughout the installation process and access to accredited Alternative Dispute Resolution, if things do go wrong. The codes it lists as currently approved are the Home Insulation and Energy Systems Contractors Scheme (HIES), the Renewable Energy Consumer Code (RECC) and the redeveloped Microgeneration Certification Scheme (MCS:2025).

On the installation itself, Ofgem says all heating systems installed under the scheme must meet the relevant MCS standards, and that for the scheme’s purposes commissioning means the heating system is fully installed, tested, and signed off to MCS standards and manufacturer requirements. It also says the property owner must become the legal owner of the heat pump once the installation is complete.

What we did not find is as important. We searched Ofgem’s installer guidance and the Boiler Upgrade Scheme regulations for guarantee, warranty and maintenance requirements for heat pumps and found none. The only maintenance and warranty paragraphs in the guidance are about biomass boilers. We have not checked every Ofgem document, so read this as “we found no”.

Ofgem does say that in an audit it may ask the installer for copies of MCS certificates and the handover pack, and that installers must keep the documents they relied on for six years. MCS also checks BUS-funded installations on Ofgem’s behalf, may contact property owners directly, and owners should aim to respond within seven days.

A compact white wall-mounted indoor unit in a bright open-plan kitchen and dining area of an apartment
A compact wall-mounted indoor unit, shown for illustration only; which system suits your flat, and whether the grant applies, is confirmed at the survey. Illustrative image.

What MCS says must be handed over

The MCS heat pump design standard, MIS 3005-D (issue 3.0), has a section on documentation and handover. It says the MCS contractor must collate a handover pack which, as a minimum, includes:

  • copies of all forms and checklists used to commission the system;
  • the maintenance requirements and maintenance services available;
  • manufacturer user manuals and warranty details; and
  • any documentation or checklists required for any incentive schemes.

It also says that when the system is handed over, that documentation must be provided and explained, together with a document signed by the contractor. That document must contain at least a declaration that the installation meets the standard, the list of key components installed, the estimate of system performance, a recommended interval for the first periodic inspection and MCS’s contact details. The standard’s model handover form leaves the inspection interval for the contractor to fill in, so we cannot give a figure.

The standard says the installation must be registered on the MCS Installation Database no later than 10 working days after commissioning and an MCS certificate generated, and that the certificate must be sent to the customer with an instruction to keep it in the handover pack. MCS’s installer operating requirements say the certificate must be provided to the customer no later than 30 calendar days after commissioning, and MCS’s page for air source heat pump owners says you will receive it within 10 working days of completion. We do not reconcile them, so ask your installer for the date in writing.

On maintenance, the design standard refers readers to a separate installation standard, MIS 3005-I, for recommended maintenance requirements. We have not opened that standard, so we do not state what it recommends. Our maintenance guide covers manufacturers’ servicing terms.

MCS guarantees, servicing information and complaints

MCS has a second set of rules, in two documents issued on 8 September 2026 and headed MCS:2025, the label Ofgem uses for the redeveloped scheme. Ofgem notes that installers not yet moved to that scheme continue under the previous one. The Customer Commitment says MCS certified installers must follow it, but MCS’s installer pages present both documents as part of moving to the redeveloped scheme, and we found no MCS page saying how they apply before that. So ask which scheme your installer is on.

For a domestic contract (one with a consumer), the Installer Operating Requirements say the installer shall provide you with a written guarantee for the system’s design and the workmanship of the installation, and with an MCS approved financial protection. We are not stating how long either lasts: ask.

The Customer Commitment sets out what the handover should include. According to it, the installer will:

  • demonstrate how the system works and explain what the key parts are;
  • give you a handover pack that, as a minimum, contains a list of key parts, health and safety guidance, a recommended servicing and maintenance schedule, the manufacturer’s instruction manuals and all relevant guarantees and warranties;
  • tell you what any financial protections, including guarantees and warranties, cover, and your right to refuse them;
  • tell you if you need to do anything to validate or maintain the guarantees or warranties, and help you understand how to avoid anything that might invalidate them;
  • tell you if there will be any ongoing checks or monitoring of the installation; and
  • tell you what to do and how to contact them if anything goes wrong or you need help with your installation.

It also says installers must give you the MCS certificate within 30 calendar days of completion, and acknowledge a complaint within two working days and respond effectively. On your side, it asks customers to keep installation documents for the system’s lifetime and to follow the handover advice for maintenance and support. See also what MCS certification means.

Who looks after the heat pump in a flat?

The sources above do not say who services a heat pump in a flat, and none says servicing is a legal duty of the owner. What they do say is narrower:

  • The handover pack should say what servicing is needed. MIS 3005-D lists the maintenance requirements and the maintenance services available, and the Customer Commitment lists a recommended servicing and maintenance schedule.
  • Warranty terms can be tied to servicing. ByEco’s brochure says that at handover it explains the servicing needed to keep the manufacturer’s warranty valid. The Customer Commitment says the installer will tell you what to do to keep guarantees and warranties valid. Whether a missed service affects a warranty depends on its terms, so read them.
  • You become the legal owner. Ofgem says the property owner must become the legal owner of the heat pump, so ask what the contract says about who handles warranty and servicing.

If you are a leasehold owner, check what your lease says about the equipment and the wall openings. If you are a landlord, decide who arranges and pays for servicing and how a tenant reports a fault, and put that in the tenancy paperwork. See also our guides to heat pumps and a leasehold flat and heat pumps for a landlord’s flat.

What to ask for in writing

These are practical suggestions, not scheme rules. Ask before you agree to anything:

  • Who is the installer? The offer box at the top of this page says installation is by ByEco’s partner MCS certified installer. Ask the name of the company that will do the work, and which company gives each guarantee.
  • Which MCS scheme and which consumer code? Ask which one the installer belongs to and the membership number, as Ofgem asks installers to provide it.
  • The written guarantee. Ask for it in writing, with its length, what it covers, and whether it covers the system’s design as well as the workmanship.
  • The manufacturer’s warranty. Ask for the terms, what you must do to keep it valid, and who registers the unit.
  • Servicing. Ask for the recommended schedule, who will do it, what it costs and what the warranty says if a service is missed.
  • Financial protection. Ask what it covers if the installer stops trading.
  • The handover pack. Ask what it will contain and the date you will receive the MCS certificate.
  • Faults. Ask who to contact and what response to expect.
  • Complaints. Ask what the procedure is and where it goes if you are not satisfied.

The Customer Commitment says an MCS certified installer will give you a copy of it before you commit to anything, so ask for that too. See also how to compare heat pump quotes.

Why it is sensible to ask early

The Boiler Upgrade Scheme is not permanent. The sources say:

  • Final date. The regulations say Ofgem must refuse to issue a voucher after 31 December 2029.
  • Budget. Ofgem cannot issue new vouchers once the budget threshold is met. If the available budget runs out, Ofgem may operate a queue, ordered by when an application is deemed properly made. Separately, the Secretary of State may introduce a cap on the number of vouchers issued each quarter.
  • Voucher validity. An air-to-water voucher expires three months after it is issued. GOV.UK words the limit differently, as 120 days from applying, so plan around whichever limit comes first.

Ofgem’s BUS monthly scheme update, with statistics to 31 October 2026 and last updated on 11 November 2026, lists £62,665,000 as the remaining budget for Year 5 (1 April 2026 to 31 March 2027). Ofgem’s footnote says that figure includes all undetermined applications and vouchers issued yet to be redeemed, and is a dynamic value. It is a snapshot, so check the latest report. We are not forecasting when funds might be used.

So asking for your free survey sooner means your application can be made while funding is available, if your flat is eligible. Rules and funding can change. For the steps after the quote, see the step-by-step guide to a heat pump in a flat.

Where ByEco stands and who to contact

ByEco’s brochure describes the last step of its process as handover and aftercare, as above. It gives no warranty length or service price, and neither do we. We have not stated what ByEco’s own guarantee covers, so ask for it in writing at the survey or with your quote.

ByEco is MCS certified for air source heat pump installation (certificate IAA10330). GOV.UK says: “The installer will apply on your behalf on the Ofgem website.” We do not say here which company that is for your flat, so ask. GOV.UK lists £7,500 towards an air-to-water heat pump and describes the grant as covering part of the cost of replacing fossil fuel heating. Whether anything is left to pay is confirmed in the quote after the survey. For the detail, read our Boiler Upgrade Scheme guide.

Your free survey is the first step. Call 0161 710 4510 or use the contact page and tell us the flat’s area, what heats it now and who owns it. See also our heat pumps and grants pages, and what happens at the free survey of a flat.

Sources

Every figure on this page was checked against primary sources on 16 November 2026. Grant rules, planning rules and prices change — if you are reading this much later, verify before acting.

Book your free home survey

Every home is different. The cost depends on the size of system, any radiators that need upgrading, the pipework and where the outdoor unit goes. Get in touch and we will arrange a free survey of your home and give you a clear quote. If you are happy with it, we can go ahead.

Common questions

Is there a minimum warranty on a heat pump installed under the Boiler Upgrade Scheme?

We found no warranty length in Ofgem's installer guidance (version 5.2) or the scheme regulations. The MCS design standard says the handover pack must include the manufacturer's warranty details and maintenance requirements, and MCS's redeveloped scheme asks for a written guarantee. Ask your installer for the lengths in writing.

What should I be given when a heat pump is handed over?

MCS's design standard says, as a minimum, copies of the commissioning forms and checklists, the maintenance requirements and services available, manufacturer manuals and warranty details, and any incentive-scheme documents. It also asks for a signed declaration, the key components, a performance estimate and an MCS certificate.

Do I have to service the heat pump myself?

None of the sources we opened says servicing is a legal duty of the owner. MCS's Customer Commitment asks customers to follow the handover advice for maintenance and support, and warranty terms can depend on servicing, so read the manufacturer's terms and the handover pack.

What if I am a landlord or a leaseholder with a heat pump that may be free of charge for an eligible flat?

Whether the grant covers the whole price depends on your flat and is confirmed in the quote after the survey. Practical suggestion: agree in writing who arranges and pays for servicing, who holds the warranty documents, and what your lease or tenancy says about the equipment.

Who do I contact if something goes wrong after installation?

Start with your installer: MCS's Customer Commitment says an MCS certified installer will tell you what to do and how to contact them, and will acknowledge a complaint within two working days. Ofgem says consumer codes provide access to accredited dispute resolution. Ask for the contact route in writing.