A heat pump may be free of charge for an eligible flat, subject to survey and eligibility, and GOV.UK says you can get one grant per property. In a converted house the harder questions are whose heating is being replaced, who owns the flat and the outside wall, and who has to agree, and the grant sources answer only some of them.

12 min read • Last reviewed • England & Wales

Free heat pump for 1 and 2 bedroom flats.*
Own a 1 or 2 bedroom flat heated by gas, oil, LPG or electricity? The heat pump we fit in flats — a compact indoor air-to-water unit, installed entirely inside your flat — is 100% covered by the Boiler Upgrade Scheme grant, so you pay nothing. Every one of the 192 flats we’ve had installed so far paid nothing. Book your free, no-obligation assessment.

*Terms and conditions apply. You must own the flat (landlords included); social housing and shared ownership aren’t eligible. It must replace gas, oil, LPG or electric heating, and the flat must not have had government heat pump funding before. Ofgem must approve the Boiler Upgrade Scheme grant, and our assessment and the installer’s heat loss survey must confirm the unit suits your flat. Any lease or freeholder consent must be in place. Installation is by our partner MCS certified installer, and the offer is subject to grant funding being available.

The short version

  • A heat pump may be free of charge for an eligible flat, subject to survey and eligibility. GOV.UK lists £7,500 towards an air-to-water heat pump and describes the grant as covering part of the cost; whether anything is left to pay is confirmed in the quote after the survey.
  • GOV.UK says you can get one grant per property. Ofgem’s installer guidance says cascade systems heating multiple unrelated properties, such as flats, are not eligible. Our sources do not otherwise address a shared boiler.
  • GOV.UK’s test is that you own the property you are applying for. The words leasehold and freeholder do not appear in the grant sources we searched.
  • Your lease, not the grant, is where the freeholder’s permission comes from. ByEco’s offer box says any lease or freeholder consent must be in place, and its brochure says the two wall openings can need council or freeholder permission.
  • The Boiler Upgrade Scheme is not permanent: its final voucher issue date is 31 December 2029, and Ofgem cannot issue new vouchers once the budget threshold is met.

When a house has been converted into flats, the flats may be held on leases from a freeholder or in some other way. This guide says which answers come from the grant sources, which from ByEco’s offer box and brochure, and which are our own suggestions. Not legal advice. See also our guide to a free heat pump for eligible flats and is my flat eligible?

Can an eligible flat in a converted house get a free heat pump?

It may, if the flat is eligible and any consent the lease requires is in place. We cannot tell you in advance that your flat qualifies. The grant (ownership, the heating being replaced and the type of property), your lease and title papers (who owns the flat and the outside wall) and the survey (the offer box says our assessment and the installer’s heat loss survey must confirm the unit suits your flat) each decide part of it.

The grant is for one property at a time

GOV.UK says: “You can get one grant per property.” Ofgem’s installer guidance says a property owner “can only consent to one voucher application per property at a time”. So a grant application is made for one property. The sources we read do not say how Ofgem treats a flat in a particular converted house, for example where a building is split into flats on one title, and we will not guess. GOV.UK says “The installer will apply on your behalf on the Ofgem website”, and that Ofgem will contact you to confirm that the installer is acting on your behalf.

The heating being replaced must be the right kind

GOV.UK says you must be “replacing fossil fuel heating systems - such as oil, gas, electric or LPG (liquefied petroleum gas)”. Ofgem’s installer guidance (V5.2, paragraph 3.37) says the previous heating system being replaced must have been either a fossil fuel-based system, such as gas, oil, LPG or coal, or an electric heating system that does not include a heat pump. The offer box says the heat pump must replace gas, oil, LPG or electric heating.

Those sentences do not say whose heating system it must be, and that matters where one boiler might heat several flats. The nearest source is paragraph 3.103: “Cascade systems heating multiple unrelated properties, such as flats, are not eligible.” Paragraph 3.102 explains that a cascade, or multi heat pump system, is a set-up where two or more heat pumps are hydraulically linked. That is about heat pumps linked together, not a shared boiler. We found no source that addresses a shared boiler serving unrelated flats, so we cannot say how the grant would treat one.

Ofgem’s guidance also covers conversions. Paragraph 3.67 says a conversion “may be treated as either a self-build or a retrofit, depending on the circumstances”, and paragraph 3.70 says a conversion “may be treated as a retrofit where a heating system was previously installed in the property and the property was occupied or used before the eligible technology was installed”. Neither paragraph mentions a house split into flats, so ask your installer how Ofgem would treat your flat.

Our suggestion: if any heating is shared with another flat, say so first and ask the installer to confirm in writing what they can do for your flat. See also can you get a heat pump in a flat?, which covers shared ground loops and heat networks.

A compact white wall-mounted indoor unit at the end of a flat hallway, with a console table and plant below
A compact wall-mounted indoor unit, shown for illustration only; which system suits your flat, and whether the grant applies, is confirmed at the survey. Illustrative image.

Who owns the flat, and what the sources do not say

GOV.UK says you are eligible if you “own the property you’re applying for (including if it’s a business, a second home, or a property you rent out to tenants)”. It does not define owning. We searched GOV.UK’s four Boiler Upgrade Scheme pages, Ofgem’s scheme web pages, its installer and property owner guidance (V5.2) and the full 2022 Regulations for the words leasehold, freehold, freeholder, leaseholder and lease. None appears in any of them. That does not mean leaseholders qualify or do not qualify: the sources are silent. GOV.UK’s separate page says you only own a leasehold property for a fixed period of time, under a legal agreement with the landlord, sometimes known as the freeholder, and that most flats are leasehold. Ask your installer how a leasehold flat is treated, and ask for the answer in writing.

A converted house can be set up in more than one way, for example one freeholder letting each flat on a lease, or flat owners who together hold the freehold. We have no source on how the grant treats each.

If more than one person owns your flat, Ofgem’s installer guidance (5.54) says: “Consent from one owner is sufficient if they confirm they have authority to act on behalf of all owners.” It adds that audits may need extra proof of ownership, such as title deeds or mortgage statements. Those paragraphs concern the owners of the property being applied for.

Who may need to agree in a converted house

For the full list of permissions, read do I need permission for a heat pump in a flat? and, for the lease in detail, heat pumps and a leasehold flat. The main ones:

QuestionWho may decideWhat the sources say
Does your lease allow the work?Freeholder or managing agent, as your lease sets outGOV.UK: your lease tells you whether you need permission to make alterations. LEASE: you might need the landlord’s permission even with planning permission
Who owns the outside wall and shared parts?Your lease and title papersLEASE: you cannot make changes to the parts your landlord owns without their permission
Do the other flats need to agree?Not stated in the sources we readLEASE: consider how work affects other leaseholders and occupiers, such as noise and access
Planning permissionNational rules; your council if you applyPlanning Portal: rules for an air source heat pump on a house or block of flats; England only
The grantOfgem, on the installer’s applicationThe grant only; it does not give permission to alter the building

Planning. The Planning Portal says permitted development rights for an air source heat pump apply to a house or a block of flats, and that a block of flats “must consist wholly of flats (e.g. should not also contain commercial premises)”. It says they do not apply within the curtilage of a listed building, that a conservation area adds limits on walls and roofs fronting a highway, and that the rights “may be removed through a planning condition, Article 4 Direction or other restriction”. Its guidance relates to England; the policy in Wales may differ. The page’s volume limit refers to an outdoor compressor unit and it does not mention wall openings for an indoor unit, so we cannot say whether those limits govern them. The sources we read do not say whether two wall openings need planning permission, so ask your council, or ask ByEco to check at the survey. See planning permission for a heat pump.

The two wall openings and whose wall it is

According to ByEco’s brochure, an indoor unit needs two circular openings through the external wall, one for the air inlet and one for the air outlet, with final sizes, positions and the terminal type confirmed on site. The brochure also says the openings can still need permission from the council or the freeholder, so ByEco checks this at the survey. See heat pumps without an outdoor unit.

In a converted house the outside wall may belong to the freeholder rather than to your flat. That depends on the lease: LEASE says your lease should tell you which parts you own and control and which the landlord owns and controls, and that you cannot make changes to the parts the landlord owns without permission. LEASE also gives “no cutting of external walls” as a clause that would prevent new openings, including for pipes, and lists installing a heat pump on the external wall among the things a lease can restrict.

Shared ownership and social housing

GOV.UK says you cannot get a grant for social housing. Ofgem’s property owners guidance says: “Properties classed as social housing are not eligible for BUS funding (this includes shared ownership properties)”, and the offer box also says shared ownership is not eligible. If your flat is shared ownership, tell the installer at the start; the survey and Ofgem decide. If you let your flat out, see heat pumps for a landlord’s flat.

What the survey and the quote decide

According to ByEco’s brochure, the free survey is a visit to measure each room and look at the walls, windows, radiators, pipework, electrics and where a unit or vents could go, followed by a room-by-room heat loss calculation and an itemised written quote with no obligation to go ahead. Ofgem asks the installer to carry out an on-site assessment and be satisfied that the property meets the eligibility requirements. See what happens at the survey of a flat.

GOV.UK says the grant’s value is taken off the amount you pay and shown on your quotation and invoice. Whether anything is left to pay is confirmed in the quote after the survey. See our Boiler Upgrade Scheme guide.

A practical checklist for a converted house

This section is our advice, not a rule from the scheme or the law. Your lease may say something different; if it is unclear, LEASE suggests a solicitor or conveyancer.

  1. Find your lease and title papers. Look for clauses on alterations, the external walls and which parts the landlord retains.
  2. Work out who to ask. GOV.UK says you have the right to know the landlord’s (freeholder’s) name and address.
  3. Tell ByEco it is a converted house. Say whether you are a leaseholder or hold the freehold, and what heats the flat.
  4. Ask in writing and keep the answer in writing. LEASE says not to rely on verbal consent, and suggests including a description of the work, plans or photos, contractor quotes and insurance details.
  5. Allow time. LEASE says a landlord does not have to reply quickly and suggests giving a reasonable period, for example 2 weeks.
  6. Leave your heating in place until it has been checked. Ofgem says installers must obtain evidence of the previous heating system.

Why it is sensible to ask early

The Boiler Upgrade Scheme is not permanent. The sources say:

  • Final date. The regulations say Ofgem must refuse to issue a voucher after 31 December 2029.
  • Budget. Ofgem cannot issue new vouchers once the budget threshold is met. If the available budget runs out, Ofgem may operate a queue, ordered by when an application is deemed properly made. Separately, the Secretary of State may introduce a cap on the number of vouchers issued each quarter.
  • Voucher validity. An air-to-water voucher expires three months after it is issued, and an expired voucher cannot be extended. GOV.UK words the limit differently, as 120 days from applying, so plan around whichever limit comes first.

Ofgem’s BUS monthly scheme update, with statistics to 31 October 2026 and last updated on 11 November 2026, lists £62,665,000 as the remaining budget for Year 5 (1 April 2026 to 31 March 2027). Ofgem’s footnote says that figure includes all undetermined applications and vouchers issued yet to be redeemed, and is a dynamic value. It is a snapshot, so check the latest report. We are not forecasting when funds might be used.

In a converted house a freeholder’s answer can take time and a voucher has a limited life, so it is sensible to settle consent first. That is our reading. Asking for your free survey sooner means your application can be made while funding is available, if your flat is eligible. Rules and funding can change.

Where ByEco stands

Call 0161 710 4510 or use the contact page and tell us the flat’s area, that it is in a converted house, what heats it and who owns the freehold. The survey is free, and it is how we look at whether your flat may be eligible. See also our heat pumps and grants pages, or get in touch for your free survey.

Worth asking any installer: how is a leasehold flat treated for the grant, and what does the contract say if consent is refused or the application is rejected?

Sources

Every figure on this page was checked against primary sources on 15 November 2026. Grant rules, planning rules and prices change — if you are reading this much later, verify before acting.

Book your free home survey

Every home is different. The cost depends on the size of system, any radiators that need upgrading, the pipework and where the outdoor unit goes. Get in touch and we will arrange a free survey of your home and give you a clear quote. If you are happy with it, we can go ahead.

Common questions

Can a flat in a converted house get a free heat pump if it is eligible?

It may, subject to survey and eligibility. GOV.UK says you can get one grant per property and that you must own the property you are applying for. The sources we read do not mention leasehold or freeholders, and your lease is a separate matter. Whether anything is left to pay after the £7,500 grant is confirmed in the quote.

Is a shared boiler in a converted house eligible for the grant?

We found no source that says. Ofgem's guidance says cascade systems heating multiple unrelated properties, such as flats, are not eligible, but that is about linked heat pumps, not a shared boiler. Ask the installer to confirm in writing what they can do for your flat before any survey work is done.

Do I need my freeholder's permission for a heat pump in a converted house?

It depends on your lease. The Leasehold Advisory Service says that, depending on your lease, you might need the landlord's permission before making alterations, even with planning permission. ByEco's offer box says any lease or freeholder consent must be in place. The grant sources we searched do not mention freeholders.

Do the other flats have to agree to a heat pump on the outside wall?

We found no source that says they must. The Leasehold Advisory Service asks you to consider how work affects other leaseholders and occupiers, such as noise and access, and your lease may have its own rules. Whether the outside wall belongs to the freeholder depends on your lease. Asking early is our suggestion.

Does a free survey of a flat in a converted house cost anything?

ByEco's free survey is described in the offer box as a no-obligation assessment. Whether the heat pump itself is free of charge depends on your flat being eligible for the Boiler Upgrade Scheme and on the survey, and whether anything is left to pay is confirmed in the written quote.

More advice